Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Across the full breadth/scope of the six HLS documents:
    • Resolve a high level scope tension: The full scope of the six HLS documents is considerably larger than the scope of WIP II as stated in the Business Justification Case (BJC). Do we want to go with the smaller, the larger or somewhere in between? Once this question is answered one document (set) needs updating. This decision might also influence whether the success indicator work should be across the full breadth or for each HLS area.
    • Draft a vision or mission statementan elevator pitch: A short, powerful, persuasive statement explaining why we are doing WIP II
    • Make high level IA decisions: To reduce the probability that significant rework of content will be required high level IA decisions should be made before the detailed content planning and writing begins. I expect that this is a web team decision, with input from PMO and maybe even higher. The following issues have already been identified and require decisions:
      • Postgraduate: Will postgraduates be an audience at the top level of the banner, alongside future students and current students?
      • Research: Will the Research zone be the home for the large number of research sites, institutes and chairs?
      • Learning and Teaching: Does not seem an audience or client group. How could this be best reshaped, moved or demoted? 
      • Others: ???

...